PM Surya Ghar Muft Bijli Yojana

250 kW Solar Power Plant in India

With rising electricity costs and a global push toward clean energy, the Indian government’s PM Surya Ghar: Muft Bijli Yojana is a major step in empowering citizens to adopt rooftop solar — and get up to 300 units of electricity free every month.

This guide walks you through the benefits, eligibility, and application process — with practical insights to help you make the most of the scheme.

PM Surya Ghar Muft Bijli Yojana

What is the PM Surya Ghar Yojana?

Launched by the Government of India, the PM Surya Ghar: Muft Bijli Yojana aims to bring solar power to 1 crore homes through rooftop solar installations. It offers:

Subsidy support (directly to your bank account)

Net-metering benefits

Up to 300 free electricity units per month

Whether you’re a homeowner in a city or a small town, this scheme makes clean, affordable power accessible and hassle-free.

Who is Eligible?

You can apply if you:

  • Are an Indian resident
  • Own a house with a suitable rooftop
  • Have a valid electricity connection
  • Are serviced by a participating DISCOM (Electricity Board)

Steps to Apply for Rooftop Solar

Applying is simple and done entirely online. Here’s a quick breakdown of the official steps as per the government portal:

Step 1: Register on the Portal

• Mobile number + OTP
• Name, state, district, email → save profile

Step 2: Vendor Consent

• Choose if vendor will fill the form or you

Step 3: Apply for Rooftop Solar

• Enter DISCOM, consumer number
• Fetch & auto-fill details

Step 4: Fill Application & Submit

• Enter capacity
• Submit the form

Step 5: Feasibility Approval

• DISCOM reviews → approval notification

Step 6: Select Vendor & Install System

• Choose vendor
• System is installed with all supporting documents

Step 7: Commissioning & Subsidy Claim

• Once your system is installed and commissioned
• The DISCOM engineer will inspect the plant
• A Project Commissioning Certificate is issued
• You or your vendor can claim the subsidy by uploading final documents

Benefits of the Scheme

Financial Subsidy up to ₹78,000 (for 3 kW system)

Zero Bills up to 300 units/month

Net Metering: Sell excess electricity back to the grid

Environmental Impact: Reduce carbon footprint significantly

Increase Property Value with rooftop solar

Pm Scheme in india

Documents Required

Here’s a quick checklist of what you’ll need during the application:

Electricity Bill (Latest)

Consumer Number

Net Metering Agreement

Plant Photos (during/after installation)

Panel & Inverter Warranty Cards

Vendor Agreement

Bank account details & cancelled cheque

Subsidy Details

The subsidy amount is calculated based on your system’s size:

System SizeApprox. CostGovt. SubsidyFinal Cost (Est.)
1 kW₹60,000₹30,000₹30,000
2 kW₹1,20,000₹60,000₹60,000
3 kW₹1,80,000₹78,000₹1,02,000

Subsidy is transferred directly to your bank account within 30 days of successful system commissioning.

Expected Timeline

Activity

Timeline

Application Submission

Day 1

Feasibility Approval

7–10 working days

Installation Completion

5–7 days

Inspection & Commissioning

~5 days

Subsidy Disbursement

~30 days post-commissioning

Advantage of Choosing Synergy Solar Solution

As an MNRE-compliant vendor under the PM Surya Ghar Yojana, Synergy Solar Solution is committed to making solar simple, transparent, and accessible — one rooftop at a time.

Z

Registered Vendor Under PM Surya Ghar

We are officially onboarded to provide installation services as per the government’s solar subsidy scheme — ensuring 100% eligibility and process compliance.

Z

We Handle Everything — Installation to Inspection

From site visits to final commissioning, our trained team manages complete rooftop solar setup, net-metering coordination, and documentation uploads — so you don’t have to.

Z

End-to-End Support for Customers

We guide every applicant through:
• Online portal registration
• Feasibility coordination with DISCOMs
• Uploading photos, agreements, and subsidy claims

Z

DCR-Compliant Materials Only

We use only DCR-approved solar panels and inverters, qualifying every project for full subsidy as per government norms.

Z

Local Presence. Personalized Service

We’re a growing company with a hands-on team that believes in customer-first execution, timely responses, and transparent pricing.

FAQ

Can I choose my own vendor, or is one assigned?

Yes, after your application is approved, you can select your own MNRE-approved vendor from the list shown on the portal. Synergy Solar Solution is available in multiple regions.

What is a DCR-compliant panel, and why is it important?

DCR (Domestic Content Requirement) panels are Made in India solar panels required for subsidy eligibility. Synergy Solar only uses DCR-compliant components to ensure you qualify.

Is Synergy Solar Solution an approved vendor under this scheme?

Yes, Synergy Solar Solution is a registered MNRE-compliant vendor eligible to install systems under the PM Surya Ghar Yojana and assist in documentation and subsidy claim.

How long does it take to complete the process?

On average, the full cycle — from application to subsidy credit — takes 30 to 45 days, depending on your DISCOM and installation timeline.

Can tenants or rented houses apply for the scheme?

No, the scheme is only applicable for property owners with rooftop access and a valid electricity connection in their name.

Will I still get a bill after installing solar?

You’ll receive an electricity bill, but if your consumption stays below 300 units, it could be ₹0. For higher usage, you’ll pay only the difference.