In the last ten years, solar panel costs have significantly dropped thanks to advancements in solar photovoltaic technology. Despite the initial expense, solar power stands out as the most advantageous renewable energy option, providing free electricity for a quarter-century. Enhanced energy generation efficiency, ongoing savings on energy bills, and subsidies in Tamil Nadu further enhance its appeal. Solar system prices in Tamil Nadu fluctuate based on factors such as technology, type, size, and the level of government support.

The New and Simplified Programme for Rooftop Solar Phase II represents a robust nationwide initiative to incentivize the utilization of solar energy for residential power needs across India. This scheme offers households and housing societies the opportunity to embrace solar energy at a reduced price, such as the 5kW solar panel rate in Tamil Nadu, or any other capacity they choose. Those who opt for grid-tied solar PV systems incorporating domestically manufactured solar components can benefit from the solar system subsidy in Tamil Nadu.

Depending on the system’s size, applicants can receive a predetermined Central Financial Assistance (CFA) or Central Government Subsidy per kilowatt by submitting their applications through the National Portal for Rooftop Solar.

Rooftop Solar System CapacityApplicable Subsidy (₹)
Up to 3 kW18,000/kW
Above 3 kW and up to 10 kW9,000/kW*
Above 10 kW1,17,000**
Resident Welfare Associations (RWA) / Group Housing Societies (GHS)Rs. 9,000/- per kW For common facilities up to 500 kWp @ 10 kWp per house, with the upper limit being inclusive of individual rooftop plants already installed by individual residents in that GHS/RWA at the time of installation of RTS for common activity.

Curious about the cost of a 1kW solar panel in Tamil Nadu? Solar power systems linked to the grid, known as on-grid systems, qualify for solar system subsidies in Tamil Nadu. Prices vary based on the system type you select. Opting for an on-grid solar system is the most economical choice, as it doesn’t include solar batteries. Consumers desiring solar batteries for backup power can opt for a hybrid or off-grid solar system, though these are ineligible for subsidy assistance.

Solar System SizePrice Range (Estimated)
1kW Solar SystemRs. 75,000 – 85,000
2kW Solar SystemRs. 1,50,000 – 1,70,000
3kW Solar SystemRs. 1,89,000 – 2,15,000
4kW Solar SystemRs. 2,52,000 – 2,85,600
5kW Solar SystemRs. 3,15,000 – 3,57,000
10kW Solar SystemRs. 5,31,000 – 6,07,000

MNRE has introduced the National Portal for Rooftop Solar, an online platform allowing homeowners to apply for subsidies through a straightforward process. The subsidy processing and disbursement have been streamlined for convenience.

Given that the CFA/subsidy remains consistent across various system capacity categories, determining the solar panel price in Tamil Nadu with the subsidy factored in is straightforward. For a precise assessment of solar system costs tailored to your location and energy requirements, it’s advisable to seek a customized quote from a reputable solar installation company.

Solar System SizeEstimated Price RangeSubsidy ApplicablePrices After Subsidy
1kW Solar SystemRs. 75,000 – Rs. 85,000Rs. 18,000Rs. 57,000 – Rs. 67,000
2kW Solar SystemRs. 1,50,000 – Rs. 1,70,000Rs. 18,000 x 2 = Rs. 36,000Rs. 1,14,000 – Rs. 1,34,000
3kW Solar SystemRs. 1,89,000 – Rs. 2,15,000Rs. 18,000 x 3 = Rs. 54,000Rs. 1,35,000 – Rs. 1,61,000
4kW Solar SystemRs. 2,52,000 – Rs. 2,85,600Rs. 18,000 x 3 + Rs. 9,000 x 1 = 63,000Rs. 1,89,000 – Rs. 2,22,600
5kW Solar SystemRs. 3,15,000 – Rs. 3,57,000Rs. 18,000 x 3 + Rs. 9,000 x 2 = Rs. 72,000Rs. 2,43,000 – Rs. 2,85,000
10kW Solar SystemRs. 5,31,000 – Rs. 6,07,000Rs. 1,17,000Rs. 4,14,000 – Rs. 4,90,000

To install an RTS plant through the new and simplified process, you must apply via the National Portal for Rooftop Solar, which facilitates efficient processing and disbursement of subsidies for solar panels in Tamil Nadu or anywhere else in India.

Please enable JavaScript in your browser to complete this form.

Here’s a step-by-step guide:

Step 1: Download the SANDES app on your mobile phone and register on the National Portal. During registration, select the local DISCOM company and provide electricity connection details, along with an active phone number and email ID.

Step 2: Log in to the portal and initiate the subsidy process by submitting an online application. Provide basic information such as the name on the electricity bill, address, proposed RTS plant capacity, and details of any existing solar system. Upload a copy of the latest electricity bill.

Step 3: The application is forwarded to the region’s DISCOM company for approval based on the technical feasibility of the RTS installation. Wait for the Technical Feasibility Report (TFR) approval before proceeding with the installation.

Step 4: Upon TFR approval, select a vendor registered or empanelled with the local DISCOM company to carry out the installation. Ensure the system comprises domestically-manufactured solar modules and a BIS-certified solar inverter. Sign a model agreement with the vendor to protect consumer interests.

Step 5: Upload complete project information on the portal for scheduling the on-site inspection and net-metering integration. Submit the net-metering application as instructed by the DISCOM.

Step 6: A field officer authorized by the DISCOM inspects the installed RTS plant for compliance with technical specifications and standards. After inspection, a net meter is integrated into the system.

Step 7: Upon successful inspection and net-metering installation, a commissioning certificate is generated, downloadable from the portal. This concludes the subsidy application process.

Step 8: Check approved subsidy details and the Central Financial Assistance (CFA) amount online. To receive the approved subsidy, provide a copy of the cancelled cheque and requested bank details on the portal. The fund handling agency transfers the subsidy directly to your bank account within 30 days post-installation.

The Tamil Nadu solar subsidy represents a strategic step toward forging a sustainable future. In our technology-centric society, we’re depleting conventional energy reservoirs, which are finite in nature. This surge in demand has led to steep tariff hikes for electricity.

The solar subsidy initiative encourages consumers to embrace renewable energy sources for their energy needs. By harnessing freely available sunlight, solar panels generate electricity. Consumers procuring solar systems through the subsidy scheme benefit from protective measures outlined in subsidy guidelines, ensuring that empanelled vendors maintain RTS systems for a minimum of five years.

An increasing number of households are reaping the rewards of solar panel subsidies in Tamil Nadu, propelling the nation closer to its solar installation targets.

Below is a systematic guide to a successful rooftop solar installation:

Step 1: Consult with rooftop solar installers: Before purchasing solar systems or components, consumers should ensure that the quality and standards align with those set by the Ministry of New and Renewable Energy (MNRE). Refer to the Help Documents available on the National Portal for Rooftop Solar in the Simplification Procedure section.

Step 2: Site visit by solar installers: Solar installers conduct site visits to understand and calculate the necessary capacity and assess the available shade-free rooftop area for installation. Additional requirements for the rooftop solar system are evaluated during these visits.

Step 3: Determining required capacity for installation: As per TEDA’s specifications, 1kW of solar energy installation necessitates approximately 12 square meters or 130 square feet of space. To optimize sunlight exposure, rooftop areas should be free of obstructions such as tall buildings or trees. Panels should be positioned at least 2 feet away from the parapet wall to allow for cleaning and servicing.

The solar plant’s capacity can be determined based on the premises’ electricity consumption over the past year, referencing information available on physical copies of electricity bills through TANGEDCO’s online consumer portal.

Step 4: Requesting quotations from various installers: It’s crucial to compare products and services offered by different installers to select the most suitable installation. Obtaining quotes from multiple solar installers ensures access to the most competitive solar panel prices in Tamil Nadu.

Step 5: Assessing technical feasibility of connection with TANGEDCO distribution network: Consumers planning to install a rooftop solar PV system should contact TANGEDCO to ascertain the process for connecting the system to the utility’s distribution network or grid. TANGEDCO representatives assess the technical viability of linking rooftop solar with the electric grid at the consumer’s location.

Step 6: Fulfilling additional requirements: During site visits, installers may suggest additional requirements such as wires and an extra base for the solar system. Consumers may need to allocate space for storing panels and other components between product delivery and final installation dates.

Step 7: Material procurement: Depending on the terms outlined by the installer in the estimate, consumers may be required to make an advance payment to commence the rooftop solar installation process. Installers must supply materials within the specified time frame after receiving the advance payment, contributing to the solar system price in Tamil Nadu.

Step 8: Installation of the plant: Installers complete the installation after delivering materials within the estimated time frame. Solar panels are positioned at an angle to capture optimal solar energy, with the angle varying based on the locale and other factors, typically ranging from 5 to 15 degrees.

The net meter, coupled with your solar panels, functions to monitor and log the energy flow to and from the local grid while managing surplus solar electricity. Through net metering, households equipped with solar power can sell excess energy to the grid in exchange for solar credits. Depending on the system size chosen, surplus units may be generated during peak sunlight hours.

Conversely, insufficient sunlight may lead to a shortfall in solar electricity production. However, net-metered households can still access electricity from the grid as needed.

If imported energy surpasses exported energy, the consumer pays the utility based on the net meter reading, representing the disparity between imported and exported energy. Conversely, if exported energy exceeds imported energy, the utility compensates the consumer for the net exported energy. It’s essential to note that an additional fee is incurred for installing a net meter, separate from the 3kW solar panel price in Tamil Nadu or any other system size selected.

Here are the steps to apply for a net meter in Tamil Nadu:

Step 1: Reach out to the Tamil Nadu Generation and Distribution Corporation (TANGEDCO) to acquire the net meter application form.

Step 2: Complete the form with details related to your RTS system and personal information, such as name, address, connection particulars, and solar system capacity.

Step 3: Include the necessary documents, such as a copy of your electricity bill, identification proof, address verification, and a letter from your solar installer specifying your solar system’s capacity.

Step 4: Submit the filled application form and documents, along with the processing fee, to the TANGEDCO office in your locality.

Step 5: TANGEDCO will assess your application and conduct an inspection of your premises to verify compliance with safety and technical standards.

Step 6: Upon approval, TANGEDCO will install the net meter, which monitors both the electricity generated by your system and fed into the grid, and the electricity consumed from the grid. You can then commence benefiting from net metering, earning credits for surplus electricity generated by your solar system. Over time, these savings offset your initial solar investment and future electricity expenses.

Financial backing for the renewable energy sector is imperative if India aims to transition to clean energy. Hence, there is a necessity to strategize subsidy programs for the residential sector to persist in the foreseeable future.

Although the adoption of rooftop solar systems in the residential sector has been sluggish, projections suggest an improvement. This is anticipated as the state government enhances the allocation of subsidies, leading to a surge in future home solarization.

The rooftop solar subsidy in Tamil Nadu offers an ideal opportunity to embrace solar energy. At Powermatics India, we boast years of expertise in installing aesthetically pleasing, highly durable, grid-connected rooftop solar solutions tailored to each client’s requirements. If you require assistance in estimating the cost of a 1kW solar panel in Tamil Nadu for your residence or any larger system size, we strongly recommend scheduling a consultation with us promptly.

Frequently Asked Questions

A 1kW rooftop system generally requires 10 sq. meters of shadow-free area. Actual sizing, however, depends on local factors of solar radiation and weather conditions, the efficiency of the solar system, the shape of the roof etc.

The beneficiary may choose the capacity depending on the authorised demand of the existing service, the load requirements of the beneficiary, and the availability of a shadow-free rooftop area. Check out the 2kW solar panel price in Tamil Nadu to plan your solar transition.

The concerned Executive Engineer/O&M will complete the feasibility analysis of distribution transformer capacity based on the verification by the Assistant Executive Engineer/O&M concerned. After receipt of the feasibility report from the Executive Engineer/O&M, the same has to be informed to TEDA for the issue of a work order to the vendor to install the plant as per the technical standards.

The customer must select the vendor from the list of empanelled vendors after registering their applications on the unified National Portal for Rooftop Solar. Following the issuance of the technical feasibility report, the vendor can install the approved RTS plant capacity. The customer must pay the vendor in full and claim the applicable subsidy by submitting the RTS-related documents on the portal. Upon approval, the subsidy payment is credited directly into the beneficiary’s account.

Grid Connected RTS System cannot generate electricity during the night. In the absence of generation during night/monsoon, households can draw the required power from the grid.