Increasing usage of multiple electrical appliances in households has led to a significant surge in electricity bills. However, there’s a solution to mitigate these costs without sacrificing your power requirements: harnessing alternative energy sources. While the upfront investment in solar energy may seem daunting, it’s actually a more cost-effective option compared to traditional sources. Thanks to advancements in photovoltaic technology, solar power is becoming increasingly accessible and affordable.

In Gujarat, the adoption of solar systems is on the rise, fueled by subsidies offered by both the state and central governments. The price range for solar panels in the region varies from Rs. 75,000 to Rs. 85,000 per 1kW, influenced by factors such as panel efficiency, technology, and brand. The process of accessing subsidies for solar panels in Gujarat has been streamlined with the introduction of the National Portal for Rooftop Solar, making it more convenient for residents.

Establishing a solar rooftop in Gujarat has become more accessible and cost-effective, thanks to the availability of solar subsidies in the region. The Ministry of New and Renewable Energy’s Rooftop Solar Programme Phase 2 extends fixed financial assistance for grid-tied solar rooftop systems not only in Gujarat but throughout India. This subsidy initiative aims to reduce the initial expenses associated with solar PV systems for individual households and residential complexes. However, it’s worth noting that industrial and commercial structures, including PSUs, do not qualify for this subsidy scheme.

The introduction of the National Portal for Rooftop Solar has streamlined the process of applying for and receiving subsidies. This online platform offers a unified, transparent, and efficient avenue for consumers to submit subsidy applications effortlessly from the comfort of their homes, making the entire process more accessible and user-friendly.

Rooftop Solar System CapacityApplicable Subsidy (₹)
Up to 3 kW18,000/kW
Above 3 kW and up to 10 kW9,000/kW*
Above 10 kW1,17,000**
Resident Welfare Associations (RWA) / Group Housing Societies (GHS)Rs. 9,000/- per kW For common facilities up to 500 kWp @ 10 kWp per house, with the upper limit being inclusive of individual rooftop plants already installed by individual residents in that GHS/RWA at the time of installation of RTS for common activity.

Solar system pricing in Gujarat is subject to several factors, including the capacity and type of system chosen, such as a grid-connected or hybrid setup. It’s important to note that only grid-tied solar systems qualify for the national solar subsidy scheme. Additionally, factors like efficiency ratings, the brand of solar panels available in Gujarat, and the provision of after-sales services can impact the overall cost of transitioning to solar energy.

For those uncertain about the most suitable solar system for their residence, consulting with Powermatics India can help assess individual requirements and preferences. This consultation can provide insights into selecting the right solar system and determining the optimal mounting design to conserve rooftop space effectively.

Below is an estimated breakdown of installed solar panel prices, ranging from 1kW to 5kW and beyond, in Gujarat.

Solar System SizePrice Range (Estimated)
1kW Solar SystemRs. 75,000 – 85,000
2kW Solar SystemRs. 1,50,000 – 1,70,000
3kW Solar SystemRs. 1,89,000 – 2,15,000
4kW Solar SystemRs. 2,52,000 – 2,85,600
5kW Solar SystemRs. 3,15,000 – 3,57,000
10kW Solar SystemRs. 5,31,000 – 6,07,000

Determining the price of a 3kW solar panel system in Gujarat, with or without subsidy, is relatively straightforward. Subsidy rates are standardized per kilowatt, regardless of system capacity. The calculation of solar rooftop subsidies in Gujarat involves subtracting the subsidy amount from the estimated price to derive the subsidized cost for any solar rooftop installation in the region. Below is a compilation of solar power plants in Gujarat alongside information regarding solar subsidies available in the area.

Solar System SizeEstimated Price RangeSubsidy ApplicablePrices After Subsidy
1kW Solar SystemRs. 75,000 – Rs. 85,000Rs. 18,000Rs. 57,000 – Rs. 67,000
2kW Solar SystemRs. 1,50,000 – Rs. 1,70,000Rs. 18,000 x 2 = Rs. 36,000Rs. 1,14,000 – Rs. 1,34,000
3kW Solar SystemRs. 1,89,000 – Rs. 2,15,000Rs. 18,000 x 3 = Rs. 54,000Rs. 1,35,000 – Rs. 1,61,000
4kW Solar SystemRs. 2,52,000 – Rs. 2,85,600Rs. 18,000 x 3 + Rs. 9,000 x 1 = 63,000Rs. 1,89,000 – Rs. 2,22,600
5kW Solar SystemRs. 3,15,000 – Rs. 3,57,000Rs. 18,000 x 3 + Rs. 9,000 x 2 = Rs. 72,000Rs. 2,43,000 – Rs. 2,85,000
10kW Solar SystemRs. 5,31,000 – Rs. 6,07,000Rs. 1,17,000Rs. 4,14,000 – Rs. 4,90,000
Please enable JavaScript in your browser to complete this form.

Household consumers aiming to transition to solar energy can access subsidies for solar panel systems starting from 5kW capacity in Gujarat or opt for higher capacity systems of 10kW and beyond. The installation process for rooftop solar systems is streamlined, facilitated through application submission on the National Portal for Rooftop Solar. Registering on this online platform necessitates providing an active mobile number and email address, along with downloading the SANDES APP for OTP verification.

To ensure eligibility for subsidy benefits under the simplified solar subsidy scheme, it’s crucial to understand the eligibility criteria. Consumers must procure PV modules and other components manufactured in India to qualify for the Gujarat solar subsidy. Referencing the ALMM list is recommended to ensure purchase of BIS-compliant solar PV modules from Approved Models and Manufacturers.

Situated as the westernmost state of India, Gujarat enjoys an average of over 300 days of sunshine annually. The availability of solar panel subsidies in Gujarat incentivizes homeowners to harness this abundant sunlight for generating cost-effective electricity. The solar rooftop scheme in Gujarat offers multiple advantages.

Recent reports highlight a significant uptake of solar technology among households in Gujarat, contributing to increased production of clean energy for the state. Solar energy generation processes are environmentally friendly, emitting no greenhouse gases or harmful substances into water bodies. Additionally, modern solar systems require minimal maintenance and offer enhanced safety compared to traditional energy sources.

By utilizing the electricity generated by on-site solar panels, homeowners can gradually reduce their utility bills and decrease reliance on grid electricity.

The procedure for installing a solar system in Gujarat is straightforward. Below are the step-by-step instructions to guide you through the process:

Step 1 – Registration on the official website:

Begin by registering on the National Portal for Rooftop Solar using the provided link: https://solarrooftop.gov.in/. Follow the registration instructions outlined on the portal.

Step 2 – Application for rooftop solar installation:

Once your account is set up, log in and submit your application for the Gujarat solar panel subsidy. Ensure accurate completion of all required information to avoid delays or rejections.

Step 3 – Technical Feasibility Approval/TFR:

Your subsidy application undergoes review by your state’s DISCOM to assess the technical feasibility of your intended rooftop solar (RTS) installation. Approval is granted upon verification of application accuracy; otherwise, corrections may be requested.

Selection of vendor:

Upon receiving TFR approval, choose an empanelled vendor to carry out the RTS installation, aligning with your specific needs. Select from empanelled vendors to maintain eligibility for the Gujarat solar panel subsidy. Additionally, sign the ALMM Declaration form with the chosen vendor to ensure compliance with technical specifications and MNRE standards.

Step 4 – Submission of Installation Details:

After successful installation of your home solar energy system, upload all relevant documents and installation details to the National Portal. Include a photo of the plant and beneficiary together. These details facilitate inspection and net metering integration.

Step 5 – Inspection by DISCOM:

Authorized personnel from your local DISCOM service provider conduct an onsite inspection of the installed rooftop solar energy system. They verify compliance with mandatory standards and facilitate net metering system integration.

Step 6 – Project Commissioning Status:

Upon net meter installation, the DISCOM provider approves your installed RTS plant details. An online commissioning certificate becomes available in your National Portal account. At this stage, you can proceed to pay the total solar panel price in Gujarat to the hired solar vendor.

Step 7 – Subsidy/CFA Request:

Following the generation of your plant’s commissioning certificate, submit a subsidy/CFA claim request, providing bank details along with a copy of a cancelled bank cheque or passbook.

Subsidy Release:

Upon verification of provided details, expect the Central Govt. subsidy/CFA amount to be credited directly to your bank account within 30 days post-installation.

Solar system owners often generate more electricity than they actually use. To account for this surplus electricity and receive credit, households typically install a net meter. Net metering is a utility billing method that allows solar system owners to receive credit for the excess electricity they contribute to the grid from their solar panels.

In this context, ‘net’ indicates the variance between the total solar energy produced and the total solar energy consumed. Through net metering, solar system owners can earn additional revenue by exporting any unused solar energy back to the main grid.

To request a net meter for your solar power plant in Gujarat, you should follow these steps:

  1. Request your installer to initiate the net meter application process.
  2. Provide the required one-time password and essential documents.
  3. Once the application is submitted, a DISCOM officer will review it. Note that approval from the officer is mandatory.
  4. Upon approval, you will receive a letter generated by the state DISCOM.
  5. An officer will visit your premises to assess suitability.
  6. Proceed with the payment.
  7. Following payment, the installation and verification process will commence.
  8. Finally, the net meter will be installed, and your home solar system will be commissioned.

There’s a growing awareness among people about the environment and the detrimental effects of global warming. Consequently, they are making concerted efforts to protect it. Embracing solar power as an alternative to conventional energy sources is one such initiative. Government subsidies have significantly bolstered the installation of solar systems, driving this movement forward.

The central government is providing subsidies with the aim of achieving its target of adding 40 GW of solar (RTS) capacity by March 2026. Once this target is reached, the subsidy program may be phased out. Therefore, it’s advisable to take advantage of the subsidy assistance now to both positively impact the environment and benefit your finances.

Frequently Asked Questions

The Rooftop Solar Programme Phase 2 constitutes a nationwide subsidy initiative that reduces rooftop solar system costs for residential installations. The National Portal for Rooftop Solar extends its invitation to consumers from all states to apply for solar subsidies and transition to clean energy sources. Additionally, subsidy rates are standardized, and the online application process remains uniform for all interested consumers seeking to adopt solar energy under the subsidy scheme.

The cost of a 5kW solar panel system in Gujarat ranges from Rs. 3,15,000 to Rs. 3,57,000, contingent on factors such as size, material, efficiency, and brand. Eligible consumers can avail themselves of a subsidy amounting to Rs. 58,352 under the central government solar policy.

When contemplating 3kW solar panel prices in Gujarat, an on-grid configuration emerges as the most economically viable option. An on-grid solar system comprises fewer components, all of which must meet ALMM guidelines and BIS standards to qualify for the subsidy scheme. Alternatively, if maximizing your location’s solar energy potential and mitigating power outages are priorities, a hybrid model integrating solar batteries may be preferable. Unlike the on-grid counterpart, the hybrid system provides round-the-clock power availability; however, it does not qualify for the subsidy scheme.

Selecting the optimal system size hinges on various factors including household dimensions, energy requirements, and the unobstructed area available for solar panel installation. For example, a 2/3 BHK residence with a 10 square meter solar panel installation space necessitates a 1kW solar system, sufficient to power the entire household. Typically, setting up a 1kW solar system requires the installation of merely 3-4 solar panels ranging from 330 to 250 watts each.

Indeed, most solar panel suppliers furnish a performance warranty spanning 20-25 years for solar panels, while ancillary components like solar inverters and batteries carry product warranties ranging from 5 to 10 years. Prior to procurement, it’s advisable to verify the warranty duration and post-sales services offered by solar component manufacturers. Moreover, empanelled vendors under the central government subsidy program are mandated to provide 5 years of maintenance services for subsidized rooftop solar systems.

Open chat
Hello 👋
Can we help you?